Week #5: June 10th - June 16th
Group Log The group met to work together on Wednesday. Zach and Conner successfully passed data to and from the MCUs directly using the...
1 min read
Â
Week #5: June 10th - June 16th
Individual Log - Conner Most of the work I completed this week was with the group. The individual work that I completed was further...
1 min read
Â
Week 5: June 10th - June 16th
Individual Log - Prem The logic controller design was finalized this week so that efforts can now be directed at assembling the water...
2 min read
Â


Week 5: June 10th - June 16th
Individual Log - Zach To prepare for our next group meeting, the week began with the goal to complete the import of thermostat BLE test...
2 min read
Â
Week 4: June 2nd - June 8th
Individual Log - Prem Since the logic controller operated on 12V and all GPIO pins had a maximum threshold of 3.3V, circuits needed to be...
2 min read
Â
Week 4: June 2nd - June 8th
Individual Log - Conner Met with the group to work on bringing the project together. Zach and I worked on expanding the Bluetooth code...
1 min read
Â


Week 4: June 2nd - June 8th
Individual Log - Zach Initial goals for the week were to finalize the thermostat enclosure design and prepare it for 3D printing,...
2 min read
Â


Week 3: May 22nd - June 1st
Individual Log - Prem As requested from Dr. Ejaz during our previous meeting, adding a circulation pump to allow the product to produce...
2 min read
Â
Week 3: May 22nd - May 29th
Individual Log - Conner I created a state of charge module using a AA battery and a voltage divider circuit. The Arduino can measure the...
1 min read
Â


Week 3 & 4: May 22nd - June 1st
Individual Log - Zach With Memorial day passing our scheduled meeting days have changed, and weeks 3 and 4 have intersected some....
3 min read
Â


Week 2: May 15th - May 21st
Individual Log - Conner We began the week by evaluating the feedback from Dr. Ejaz. The group met to redo the weekly timeline and create...
1 min read
Â


Week 2: May 15th - May 21st
Individual Log - Zach The week began with revisions to code for text displayed on the LCD screen, reducing the needed lines for...
1 min read
Â


Week 2: May 15th - 21st
Individual Log - Prem An initial dual comparator circuit was designed (fig. 1) and built to test the regulation capabilities of the...
2 min read
Â
Week 1: May 8th - May 14th
Individual Log - Conner This week was spent reviewing the feedback from the presentations and talking with the group to determine steps...
1 min read
Â


Week 1: May 8th-May 14th
Individual Log - Prem The internal power supply of the generator featured Zener diode soldering locations so one rated for 15V was...
1 min read
Â


Week 1: April 10 - May 14
Individual Log - Zach Proposal: Week 14 was spent exclusively revising the report with group members, and preparing both the slideshow...
1 min read
Â