top of page

Week #13: April 3rd - April 9th

  • zcarlier
  • Apr 10
  • 1 min read

Group Log


The focus of this week was to complete all sections of the report and begin revisions. Small adjustments still need to be made to satisfy our standards for submission, but the foundation and supporting details are completed. The engineering requirements has been modified to align with Dr. Ejaz and the group's expectations. The limitations and report formatting have been adjusted for clarity and a product installation and operation manual has been mentioned.

The presentation slideshow is created with many of the slides finished. The outline and presentation style has been discussed within the group and will be eager to receive feedback from Dr. Ejaz before completion.

 
 
 

Recent Posts

See All
Week #13: April 3rd - April 9th

Individual Log -Prem Additions were made to sections of relevant to me on the report, and tables were formatted and refreshed with...

 
 
 
Week #13: April 3rd - April 9th

Individual Log - Conner After meeting with Dr. Ejaz and the group, I began working on the deliverables for the upcoming week. The main...

 
 
 

Comments


© 2035 by Site Name. Powered and secured by Wix

bottom of page