Week #10: July 14th - July 20th
Individual Log - Prem The majority of this week was spent testing and publishing all results for final testing of thermostat and valve...
Week #10: July 14th - July 20th
Group Log The group met many times this week to finalize the project, finish the report, and prepare for the presentation. Many planning...
Week #10: July 14th - July 20th
Individual Log - Conner Started the week by updating the valve code to fix any issues that needed to be addressed before testing could...
Week #10: July 14th - July 20th
Individual Log - Zach This week I started by reviewing the entire report to correct and adjust anything that used future tense, as the...


Week #9: July 7th - July 13th
Individual Log - Prem The majority of this week was spent testing the functionality of the valve enclosure and diagnosing/debugging...
Week #9: July 7th - July 13th
Group Log The group met again on Wednesday to bring the project together and iron out any issues that were presented during last week's...


Week #9: July 7th - July 13th
Individual Log - Conner This week I fixed necessary coding issues for the valve enclosure, reconstructed the valve software flowchart,...


Week #9: July 7th - July 13th
Individual Log - Zach I started this week by creating final software flow charts for the thermostat and adding them to the report....


Week #8: July 30th - June 6th
Individual Log - Prem The majority of this week was spent designing and assembling the valve enclosure. Apart from the entrance and top,...
Week #8: June 30th - July 6th
Group Log The group met again on Wednesday to bring together everyone's individual work and perform the first test of the complete...
Week #8: June 30th - July 6th
Individual Log - Conner Following the group's meeting to test the smart water faucet, I began researching and troubleshooting the code...
Week #8: June 30th - July 6th
Individual Log - Zach I began this week by diving into the final report, and began to rearrange sections according to the rubric's...


Week #7: June 23rd - 29th
Individual Log - Prem This weeks progress was limited because I had to go out of town for the weekend, but final fitment has been made...
Week #7: June 23rd - June 29th
Individual Log - Conner Added the remaining functions to the valve code. Annotated code to account for changes with variables, SOC...
Week #7: June 23rd - June 29th
Group Log This weeks group meeting consisted of Prem and Zach. We discussed the tables hosted on the website, and what edits needed to be...
Week #7: June 23rd - June 29th
Individual Log - Zach This weeks efforts were focused on polishing the website, assisting with and troubleshooting valve enclosure...
Week #6 June 16th - June 22nd
Group Log The group reconvened on Wednesday to combine more individual work and test the project. Zach and Conner refined the bluetooth...
Week #6: June 16th - June 22nd
Individual Log - Conner This week, I created another digital output program to work with the logic controller. After further testing with...


Week #6: June 16th - 22nd
Individual Log - Prem For this week, I assembled the mechanical components of the valve regulator and tested the systems functionality...


Week #6: June 16th - June 22nd
Individual Log - Zach Efforts were put into finalization of the thermostat assembly and other non-technical aspects surrounding this...


Week #5: June 10th - June 16th
Group Log The group met to work together on Wednesday. Zach and Conner successfully passed data to and from the MCUs directly using the...
Week #5: June 10th - June 16th
Individual Log - Conner Most of the work I completed this week was with the group. The individual work that I completed was further...
Week 5: June 10th - June 16th
Individual Log - Prem The logic controller design was finalized this week so that efforts can now be directed at assembling the water...


Week 5: June 10th - June 16th
Individual Log - Zach To prepare for our next group meeting, the week began with the goal to complete the import of thermostat BLE test...
Week 4: June 2nd - June 8th
Individual Log - Prem Since the logic controller operated on 12V and all GPIO pins had a maximum threshold of 3.3V, circuits needed to be...
Week 4: June 2nd - June 8th
Individual Log - Conner Met with the group to work on bringing the project together. Zach and I worked on expanding the Bluetooth code...


Week 4: June 2nd - June 8th
Individual Log - Zach Initial goals for the week were to finalize the thermostat enclosure design and prepare it for 3D printing,...


Week 3: May 22nd - June 1st
Individual Log - Prem As requested from Dr. Ejaz during our previous meeting, adding a circulation pump to allow the product to produce...
Week 3: May 22nd - May 29th
Individual Log - Conner I created a state of charge module using a AA battery and a voltage divider circuit. The Arduino can measure the...


Week 3 & 4: May 22nd - June 1st
Individual Log - Zach With Memorial day passing our scheduled meeting days have changed, and weeks 3 and 4 have intersected some....


Week 2: May 15th - May 21st
Individual Log - Conner We began the week by evaluating the feedback from Dr. Ejaz. The group met to redo the weekly timeline and create...


Week 2: May 15th - May 21st
Individual Log - Zach The week began with revisions to code for text displayed on the LCD screen, reducing the needed lines for...


Week 2: May 15th - 21st
Individual Log - Prem An initial dual comparator circuit was designed (fig. 1) and built to test the regulation capabilities of the...
Week 1: May 8th - May 14th
Individual Log - Conner This week was spent reviewing the feedback from the presentations and talking with the group to determine steps...


Week 1: May 8th-May 14th
Individual Log - Prem The internal power supply of the generator featured Zener diode soldering locations so one rated for 15V was...


Week 1: April 10 - May 14
Individual Log - Zach Proposal: Week 14 was spent exclusively revising the report with group members, and preparing both the slideshow...