Individual Log - Prem

The majority of this week was spent testing and publishing all results for final testing of thermostat and valve regulator. Videos related to testing criteria were processed and published on YouTube, and data generated by them was extracted and processed for final documentation on report. These results were then published in the Final Testing & Results section of the website by Zach. The rest of the week consisted of publishing final testing results and with the help of Zach, performing final formatting on the report. After this, the motivation, product overview, and valve regulator hardware slides were revised and published on presentation, in addition to contribution and design slides.

 
 
 

Recent Posts

See All
Week #10: July 14th - July 20th

Group Log The group met many times this week to finalize the project, finish the report, and prepare for the presentation. Many planning...

 
 
 
Week #10: July 14th - July 20th

Individual Log - Conner Started the week by updating the valve code to fix any issues that needed to be addressed before testing could...

 
 
 
Week #10: July 14th - July 20th

Individual Log - Zach This week I started by reviewing the entire report to correct and adjust anything that used future tense, as the...

 
 
 