Week #13: April 3rd - April 9th
Individual Log -Prem Additions were made to sections of relevant to me on the report, and tables were formatted and refreshed with...
1 min read
Â
Week #13: April 3rd - April 9th
Individual Log - Conner After meeting with Dr. Ejaz and the group, I began working on the deliverables for the upcoming week. The main...
1 min read
Â
Week #13: April 3rd - April 9th
Group Log The focus of this week was to complete all sections of the report and begin revisions. Small adjustments still need to be made...
1 min read
Â


Week #13: April 3rd - April 9th
Individual Log - Zach I began this week focused on continuing work toward completing the thermostat power module and finalizing how it...
1 min read
Â
Week 12: March 27th - April 2nd
Individual Log -Prem Sections of the report were edited or created including the following: objective & features, engineering...
1 min read
Â
Week 12: March 27th - April 2nd
Individual Log - Conner This week began by testing the Arduino Nano and attempting to transmit information via bluetooth. Transmission...
1 min read
Â
Week 12: March 27th - April 2nd
Group Log This weeks individual meeting was spent discussing finalizing the requirements page and guiding the work towards finishing the...
1 min read
Â


Week 12: March 27th - April 2nd
Individual Log - Zach I started my week by completing the assembly of the AC-DC converter and AC pass-through, since I discovered last...
2 min read
Â
Week 10 & 11 - March 13th - March 26th
Individual Log - Conner Following the weekly meeting with Dr. Ejaz, the group reconvened and created a goal outline. I redistributed the...
1 min read
Â
Week 10 & 11: March 13th - 26th
Individual Log - Prem For these two weeks, I made adjustments based on suggest and required revisions to requirement, specifications,...
1 min read
Â


Week #11: March 20th - March 26th
Individual Log - Zach This week I set out to make sure the report sections designated to me during our group meeting were written. After...
2 min read
Â
Week 10: March 13th - March 26th
Group Log - Meeting notes were compiled and refined into clear goals for the upcoming weeks. Goals for the week were distributed among...
1 min read
Â


Week 10: March 13th - March 19th
Individual Log - Zach Following a group meeting on March 15th, goals for the next two weeks were determined and assigned to each group...
1 min read
Â
Week 9: March 6th - March 12th
Group Log - A meeting was held a few hours after the weekly meeting with Dr. Ejaz to discuss and distribute the deliverables requested...
1 min read
Â
Week #9 - March 6th - March 12th
Individual Log - Prem All sections of the engineering requirements table were revised, high and low priority sections were created, and...
1 min read
Â
Week #9 - March 6th - March 12th
Individual Log - Conner The meeting with Dr. Ejaz set clear direction and expectations for the upcoming week. The group met again to...
1 min read
Â
Week 9: March 6th - March 12th
Individual Log - Zach Following the meeting with Dr. Ejaz, the group convened later that evening and formed an outline for workload...
1 min read
Â
Week 8 - February 27th - March 5th
Individual Log - Conner This week was spent adding a description for the survey and adding it to the landing page of the website. I added...
1 min read
Â
Week 8: February 27th - March 5th
Individual Log - Prem For this week, I created and embedded 4 tables into the website (power requirements, product requirements, product...
1 min read
Â
Week 8: February 27th - March 5th
Individual Log - Zach I began this week by addressing the adjustments mentioned in the weekly meeting by Dr. Ejaz, this included resizing...
1 min read
Â