Week #9 - March 6th - March 12th
- zcarlier
- Mar 13
- 1 min read
Individual Log - Conner
The meeting with Dr. Ejaz set clear direction and expectations for the upcoming week. The group met again to determine responsibilities and a plan for the week. Since I had designed the 3d model for the valve enclosure, I created the model for the thermostat enclosure as well. Once these were completed, I added an easy way to view the models on the website and adjusted the drawings to have the same units and style.
After the meeting, the survey was distributed and the responses were analyzed. More responses were expected and an analysis and description of the results was written in the report. As more responses come in, the report may be adjusted but the current responses display clear preferences and key points for the project. The survey description and results are found in section 1.5 of the report.
Performed more research into the wireless communication with the Arduino Nano. The Arduino has been ordered and communication method will be clear after testing. Determining the state of charge of the battery was discussed and researched. Once the Arduino is received and tested, a state of charge method will be tested as well.
Comments