Week 9: March 6th - March 12th
- zcarlier
- Mar 12
- 1 min read
Individual Log - Zach
Following the meeting with Dr. Ejaz, the group convened later that evening and formed an outline for workload responsibilities to be distributed. After the meeting concluded I immediately got to work on revising the hardware block diagrams, as requested by Prem, and created a modular block diagram based on our Engineering Specifications sheet. I submitted this to the group the next morning for review, and made edits as needed. The weekend was spent preparing the report's flow and structure based on the template provided, adding more sections to accommodate the features and information that would need to be covered, and finally writing sections 1.1, 1.2, 1.3, 1.8, and parts of 1.6. To conclude the week, edits were made to the thermostat power specifications, proposed budget, engineering specs & requirements; the survey was distributed to a select few groups of my peers/colleagues; comparable products were added to the landing page; and the report was added to the website so that it may be viewed for the next meeting.
Comments