Individual Log - Prem

Following feedback from Dr. Ejaz, abstract was revised to introduce need, existing solutions, and proposed solution in this order. Initial engineering specifications, hardware block diagram, and power budget for valve regulator were generated and published. Individual biography was also published. Currently, tables are still not integrated directly on website, but this will be addressed when final revisions are published since generating and editing tables directly on Wix is not efficient.

 
 
 

Recent Posts

See All
Week #13: April 3rd - April 9th

Individual Log -Prem Additions were made to sections of relevant to me on the report, and tables were formatted and refreshed with...

 
 
 
Week #13: April 3rd - April 9th

Individual Log - Conner After meeting with Dr. Ejaz and the group, I began working on the deliverables for the upcoming week. The main...

 
 
 
Week #13: April 3rd - April 9th

Group Log The focus of this week was to complete all sections of the report and begin revisions. Small adjustments still need to be made...

 
 
 

Comments


© 2035 by Site Name. Powered and secured by Wix

bottom of page