top of page

Week 3: January 23rd - 29th

  • zcarlier
  • Jan 30
  • 1 min read

Individual Log - Conner

Meeting 3 discussed the expectations for the project regarding defining success, how to test, and possible limitations for the project. The group further discussed the direction the project and website will head in and the details that will be included. Goals, processes, and limits were derived using knowledge of existing location services and brainstorming the steps needed to create the project.

Additional research was done pertaining to Project 5. Frequency of the transducer was selected based on the range of operation needed to produce successful results. Further research points to direction of project and additional areas needed to be studied.

 
 
 

Recent Posts

See All
Week #13: April 3rd - April 9th

Individual Log -Prem Additions were made to sections of relevant to me on the report, and tables were formatted and refreshed with...

 
 
 
Week #13: April 3rd - April 9th

Individual Log - Conner After meeting with Dr. Ejaz and the group, I began working on the deliverables for the upcoming week. The main...

 
 
 
Week #13: April 3rd - April 9th

Group Log The focus of this week was to complete all sections of the report and begin revisions. Small adjustments still need to be made...

 
 
 

Comments


© 2035 by Site Name. Powered and secured by Wix

bottom of page