Week 2: January 16th - January 22nd
- persaudpremnauth
- Jan 22
- 1 min read
Updated: Jan 30
Individual Log - Prem
Met with Zack & Conner on the 20th following meeting with Dr. Ejaz on the 16th to revise projects to fall in line with requirements. Website structure and content were also discussed, and changes to my previous content were modified to fall in line with Zach.
Project 2 was revised to completely remove the MCU requirement. This will be made possible by utilizing OP amps for the filters and AGC in the preamplifier circuit. Three OP amps will be utilized, two for the filter, and one for the AGC.
Project 6 was researched and posted on website. Will be revised further pending feedback from Dr. Ejaz on project alignment with proposal goals.
Comments