All sections of the engineering requirements table were revised, high and low priority sections were created, and testing mechanisms were generated for everything. For the engineering specifications table, existing sections for the valve controller were modified, and new ones were created for better isolation. A power specifications table was created, and power calculations were automated with excel formulas. A proposed budget table was created, and all entries for valve regulator were entered. Like the power specifications table, total cost was automated.
Research was also performed for the justification for the product, and this information was used to complete the "motivation" section of the report, and generator was Thevenized to determine ideal output voltage & current.