top of page

Week 10 & 11: March 13th - 26th

  • persaudpremnauth
  • Mar 27
  • 1 min read

Individual Log - Prem


For these two weeks, I made adjustments based on suggest and required revisions to requirement, specifications, and power tables. Power distribution role was adopted for thermostat given the increased number of voltage rails required, and a prototype power supply board was created (9V, 5V, 3.3V triggered) to give to Zach for testing and debugging of thermostat components. Moister sensor was ordered and tested, and thermostatic valve was ordered to test as a baseline and comparison. Spectral analysis was done on generator to attain turbine speed at various load conditions to observe electrical demands on water pressure.


Sections pertaining to my work on the report have been completed which for this week are: integrated sensors (partial), project limitations, battery charging design, and power budget.

 
 
 

Recent Posts

See All
Week #13: April 3rd - April 9th

Individual Log -Prem Additions were made to sections of relevant to me on the report, and tables were formatted and refreshed with...

 
 
 
Week #13: April 3rd - April 9th

Individual Log - Conner After meeting with Dr. Ejaz and the group, I began working on the deliverables for the upcoming week. The main...

 
 
 
Week #13: April 3rd - April 9th

Group Log The focus of this week was to complete all sections of the report and begin revisions. Small adjustments still need to be made...

 
 
 

Comments


© 2035 by Site Name. Powered and secured by Wix

bottom of page