Week 10 & 11: March 13th - 26th
- persaudpremnauth
- Mar 27
- 1 min read
Individual Log - Prem
For these two weeks, I made adjustments based on suggest and required revisions to requirement, specifications, and power tables. Power distribution role was adopted for thermostat given the increased number of voltage rails required, and a prototype power supply board was created (9V, 5V, 3.3V triggered) to give to Zach for testing and debugging of thermostat components. Moister sensor was ordered and tested, and thermostatic valve was ordered to test as a baseline and comparison. Spectral analysis was done on generator to attain turbine speed at various load conditions to observe electrical demands on water pressure.
Sections pertaining to my work on the report have been completed which for this week are: integrated sensors (partial), project limitations, battery charging design, and power budget.