Week #13: April 3rd - April 9th

  • zcarlier
  • Apr 10
  • 1 min read

Individual Log - Zach

I began this week focused on continuing work toward completing the thermostat power module and finalizing how it would be assembled in its respective enclosure. A decision to switch from an LM317 voltage regulator to a L7805 proved to be beneficial. The LM317 was limited in its capabilities to provide a voltage that was stable and noise free. This may have been remedied if different resistors and capacitors had been paired with the voltage regulation circuit apart from those recommended in LM317 datasheets. The L7805 displayed far better regulation with the recommended pairing of a 0.33uF and 0.1uF capacitor, where voltage oscillation was only ~100mV. With voltage regulation and distribution completed, the power module and other components will now be soldered onto a PCB breadboard to prepare for assembly in the thermostat enclosure.


A foundation for the slideshow presentation was created, all slides were given their respective titles and tables input. Some work remains to finalize the slideshow, but this is primarily all data entry.


The rest of the week was spent finalizing some more of the report by adding component photos, preliminary work, datasheets, and editing some formatting issues encountered during the writing process.


Mock-up breadboard circuit for the Thermostat
Mock-up breadboard circuit for the Thermostat


Noise and voltage fluctuations experienced with the LM317
Noise and voltage fluctuations experienced with the LM317


Stable 5VDC voltage output while using an L7805.
Stable 5VDC voltage output while using an L7805.



 
 
 

Recent Posts

See All
Week #13: April 3rd - April 9th

Individual Log -Prem Additions were made to sections of relevant to me on the report, and tables were formatted and refreshed with...

 
 
 
Week #13: April 3rd - April 9th

Individual Log - Conner After meeting with Dr. Ejaz and the group, I began working on the deliverables for the upcoming week. The main...

 
 
 
Week #13: April 3rd - April 9th

Group Log The focus of this week was to complete all sections of the report and begin revisions. Small adjustments still need to be made...

 
 
 

Comments


© 2035 by Site Name. Powered and secured by Wix

bottom of page