Week #10: July 14th - July 20th
- zcarlier
- Jul 21
- 1 min read
Individual Log - Zach
This week I started by reviewing the entire report to correct and adjust anything that used future tense, as the project has been completed and needs to reflect this instead of suggesting a device is being developed. After this review, I began researching much deeper into regulatory compliance standards and what organizations create them, why they create them, and what their purposes are. A rather detailed section was included in the report and can be viewed in Chapter 4, section 9. A table of compliance regulations the Smart Water Faucet may be able to achieve are listed in Appendix D. We met as a group to finalize code for the valve regulator and test both devices together and confirm some of our engineering requirements.
After this, using photos taken from our group meetings and others we've taken throughout the project's development, I was able to complete the installation & user manual.
Friday, the group met to finalize any contributions, troubleshooting, and results that needed to be added to the report. Verify table of contents, list of figures and tables, and the overall flow and readability of the report. I was able to add needed final testing and results to our website which can be found under "Design Project > Final Testing & Results" from the hamburger menu.
To finish out the week, I've added my personal contributions and verifications to the slideshow, and did some (much needed) mobile website polishing. For the remainder of the week, we plan to polish the slideshow, rehearse several times, and prepare for our presentation.
Comments