Individual Log - Conner

We began the week by evaluating the feedback from Dr. Ejaz. The group met to redo the weekly timeline and create a future plan in greater detail. After the group broke off into individual work, I began creating and testing the arduino code for the flow and temperature sensor. The code seems to be working properly but will need to be properly testing in the upcoming days with different methods. (Fluctuating temps & active flow)



ree

ree

ree

After constructing the flow and temperature code, I began writing a rough draft for the moisture sensor.

To finish the week, I reviewed the CAD model for the thermostat to ensure that it was ready to send to Zach for final revisions for his physical components.

 
 
 

Recent Posts

See All
Week #10: July 14th - July 20th

Individual Log - Prem The majority of this week was spent testing and publishing all results for final testing of thermostat and valve...

 
 
 
Week #10: July 14th - July 20th

Group Log The group met many times this week to finalize the project, finish the report, and prepare for the presentation. Many planning...

 
 
 
Week #10: July 14th - July 20th

Individual Log - Conner Started the week by updating the valve code to fix any issues that needed to be addressed before testing could...

 
 
 

Comments


© 2035 by Site Name. Powered and secured by Wix

bottom of page