Week #6: June 16th - June 22nd

  • zcarlier
  • Jun 22
  • 1 min read

Individual Log - Zach

Efforts were put into finalization of the thermostat assembly and other non-technical aspects surrounding this portion of the project. On Monday, an expense report was prepared that includes both the actual expenses incurred throughout the project, as well the required amount of expense one must incur to build the thermostat. The following day, final revisions were made to the thermostat enclosure in OnShape to include additional mounting locations for the AC/DC converter, buzzer, and other adjustments as needed. A final 3D print was run for the thermostat, all mounting locations were inspected and verified for their accuracy, and the thermostat was assembled.

Components installed into the Thermostat enclosure
Components installed into the Thermostat enclosure
Completed Thermostat Prototype
Completed Thermostat Prototype

After assembling the Thermostat prototype, tests were performed using LightBlue to verify that all components and systems operated as intended. Below are is an image of the default display a user will encounter on while using the Smart Water Faucet, and videos showing some of the warnings.

Thermostat default display
Thermostat default display
ree

To aid Prem in the editing and finalization of other non-technical aspects of the project, each group member provided individual weekly contributions to the final weekly timeline and adjusted the GANTT chart where it pertains to specific members.


To close out the week, a software flowchart was prepared to illustrate how the Thermostat works and receive Prof. Young's feedback on June 26th; and a template for the "installation & operation manual" was created.

ree

 
 
 

Recent Posts

See All
Week #10: July 14th - July 20th

Individual Log - Prem The majority of this week was spent testing and publishing all results for final testing of thermostat and valve...

 
 
 
Week #10: July 14th - July 20th

Group Log The group met many times this week to finalize the project, finish the report, and prepare for the presentation. Many planning...

 
 
 
Week #10: July 14th - July 20th

Individual Log - Conner Started the week by updating the valve code to fix any issues that needed to be addressed before testing could...

 
 
 

Comments


© 2035 by Site Name. Powered and secured by Wix

bottom of page